 Incident:   ONT_9159_20180527_1100   Date:  05/27/2018 (CST)   Reliability Coordinator:  ONT 
 Initial Conditions:   LEC 150 MW CCW. IESO is unable to regulate the Ont - Mich interface.
 Flowgate:   9159 - ONTARIO-ITC   Rating:  1500   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   05/27/2018 11:00 (CST)   Effective EndTime:  05/28/2018 17:00 (CST)   TLR Duration:  30 Hours and 0 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
May 27 
10:41 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 4 / 4 
 2 / 0 
 2 / 0 
 1 / 0 
 9  /  4 
 500 
 350 
 450 
 50 
 1350 
 53.1 
 20.9 
 26.8 
 11.7 
 112.4 
 500 
 350 
 450 
 50 
 1350 
 53.1 
 20.9 
 26.8 
 11.7 
 112.4 
 450 
 0 
 0 
 0 
 450 
 50.1 
 0.0 
 0.0 
 0.0 
 50.1 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1400   N/A  N/A LEC 150 MW CCW. Decrement of 800 MW requested. Insufficient tap control on the interface
May 27 
11:33 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 8 / 1 
 8  /  1 
 449 
 449 
 52.7 
 52.7 
 449 
 449 
 52.7 
 52.7 
 97 
 97 
 28.3 
 28.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1138   N/A  N/A LEC 0. Decrement of 500 MW requested. Insufficient tap control on the interface
May 27 
12:30 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1200   N/A  N/A LEC 200 MW. Decrement of 600 MW requested. Insufficient tap control on the interface
May 27 
13:34 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 Total 
 7 / 1 
 2 / 0 
 2 / 0 
 11  /  1 
 1000 
 350 
 450 
 1800 
 56.3 
 19.7 
 25.4 
 101.4 
 1000 
 350 
 450 
 1800 
 56.3 
 19.7 
 25.4 
 101.4 
 100 
 0 
 0 
 100 
 5.6 
 0.0 
 0.0 
 5.6 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1200   N/A  N/A LEC 0 MW. 800 MW decrement requested.
May 27 
14:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1200   N/A  N/A LEC 0 MW. 800 MW decrement requested.
May 27 
15:31 (CST) 
 TLR 3A   NEXT 
 2-NH 
 7-F 
 Total 
 1 / 0 
 0 / 1 
 1  /  1 
 117 
 0 
 117 
 6.1 
 0.0 
 6.1 
 117 
 0 
 117 
 6.1 
 0.0 
 6.1 
 0 
 49 
 49 
 0.0 
 29.0 
 29.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1100   N/A  N/A LEC 100 MW CW. Decrement of 800 MW requested.
May 27 
16:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1100   N/A  N/A LEC 130 MW CW. Decrement of 800 MW requested.
May 27 
17:50 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. Decrement of 800 MW requested.
May 27 
18:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 240 MW CW. No change requested.
May 27 
19:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. No change requested.
May 27 
20:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 100 MW CW. No change requested.
May 27 
21:35 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 30 MW CW. No change requested.
May 27 
22:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 0 MW. No change requested.
May 27 
23:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 50 MW CW. No change requested.
May 28 
00:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 75 MW CW. No change requested.
May 28 
01:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. No change requested.
May 28 
02:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. No change requested.
May 28 
03:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. No change requested.
May 28 
04:29 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 200 MW CW. No change requested.
May 28 
05:37 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 11 / 0 
 11  /  0 
 1255 
 1255 
 65.6 
 65.6 
 1255 
 1255 
 65.6 
 65.6 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 0 MW. Decrement of 400 MW requested. Internal generation expected to continue to exacerbate the interface flow.
May 28 
06:35 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 0 / 1 
 0  /  1 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 125 
 125 
 7.2 
 7.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 0 MW. No change requested.
May 28 
07:31 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 150 MW CCW. Decrement of 800 MW requested.
May 28 
08:33 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 Total 
 7 / 8 
 1 / 0 
 2 / 0 
 10  /  8 
 900 
 100 
 450 
 1450 
 51.2 
 5.7 
 25.6 
 82.6 
 900 
 100 
 450 
 1450 
 51.2 
 5.7 
 25.6 
 82.6 
 850 
 0 
 0 
 850 
 48.4 
 0.0 
 0.0 
 48.4 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 12.0 
 0.0 
 0.0 
 0.0 
 0.0 
 12.0 
 0.0 
 12.0 
 0.0 
 0.0 
 0.0 
 0.0 
 12.0 
 0   N/A  N/A LEC 100 MW. Decrement 700 MW requested.
May 28 
09:41 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 7 / 2 
 7  /  2 
 890 
 890 
 52.6 
 52.6 
 890 
 890 
 52.6 
 52.6 
 175 
 175 
 10.3 
 10.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 19.0 
 0.0 
 0.0 
 0.0 
 0.0 
 19.0 
 0.0 
 19.0 
 0.0 
 0.0 
 0.0 
 0.0 
 19.0 
 0   N/A  N/A LEC 0 MW. Decrement of 550 MW requested.
May 28 
10:36 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 6.0 
 0.0 
 0.0 
 0.0 
 0.0 
 6.0 
 0.0 
 6.0 
 0.0 
 0.0 
 0.0 
 0.0 
 6.0 
 0   N/A  N/A LEC at 150 MW CW, no tap room available on the Michigan interface.
May 28 
11:32 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 200 CCW, no tap room available on the Michigan interface.
May 28 
12:33 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 275 MW CW. no tap room available on Michigan interface
May 28 
13:34 (CST) 
 TLR 3A   NEXT 
 2-NH 
 Total 
 1 / 0 
 1  /  0 
 200 
 200 
 58.5 
 58.5 
 200 
 200 
 58.5 
 58.5 
 0 
 0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 175 MW CW. No tap room available on Michigan interface.
May 28 
14:34 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 0 MW. Limited tap room available on the Michigan interface.
May 28 
15:33 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 0 MW. Limited tap room available on the Michigan interface.
May 28 
16:26 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A LEC 0 MW. Regained tap room on the Michigan interface.
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   46   5311   5311   1797 
 3   5   800   800   0 
 4   0   0   0   0 
 5   6   1350   1350   0 
 6   1   50   50   0 
 7   0   0   0   49 
 Total   58   7511   7511   1846 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 PJM   ED-2   37.0   37.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for PJM   37.0   37.0 
 Total   37.0   37.0